Snagging reports built for UK new builds, extensions & refurbishments
Pre-completion through 12-month de-snag. Plus extensions and refurb defect inspections. Compliance-rich defect schema, developer dispute log, AI assist on your notes — not your photos.
14-day free trial · All 15 report templates included · £35/month
What's in the report
Seven sections, RICS-aligned structure, NHBC chapter mapping per snag.
- A Inspection details Inspector, qualifications, plot/site, weather, methodology, areas not inspected, weather impact.
- B Property & compliance Warranty provider & cert, construction stage, smoke alarm grade (D1–LD3), CO detector, fire door rating (FD30–FD60), MVHR commissioning, boiler & Benchmark cert, ground conditions, isolator locations.
- C External inspection Brickwork, render, roof & ridge, fascias, gutters, downpipes, drainage falls, boundaries, drives. Unlimited snags per section.
- D Internal inspection Walls, ceilings, doors, windows, skirting, flooring, kitchen units, worktops, bathrooms, tiling, decoration, staircase, joinery.
- E Services check Boiler, radiators, thermostat, electrics, light fittings, plumbing, water pressure, drainage, extractor fans, smoke & CO alarms.
- F Summary Practical completion (yes/no/partial), satisfactory findings (evidence trail), certificates received, snag counts by severity, reinspection scheduling.
- G Inspector's statement Signed declaration, qualifications, RICS-aligned AI disclosure (text/photo/research), contact details, signature image.
- Pre-completion
- At completion
- Post-completion
- 12-month de-snag
- Extension / refurbishment
- NHBC Buildmark Ch 3,5,6,7,9
- Approved Docs B,F,J,K,L,M,P
- BS EN 12150 · IGEM UP/2
- HBF Consumer Code · Gas Safe
- NHBC
- LABC
- Premier Guarantee
- Checkmate
- Branded PDF
- DOCX (Word)
- Snags-only CSV
From handover to handover-ready
Four stages. Click any step to explore — or watch it play through automatically.
Built for the disputes that follow
Snagging only matters if the developer accepts the snags. We've built every feature with that in mind.
Developer dispute log
Track every snag's status: not yet submitted, accepted, disputed, agreed waiver. Developer comments captured per snag. The report becomes the evidence file.
Satisfactory findings
Log items tested as working too — smoke alarms tested, utilities confirmed, meter readings recorded. Defends against developers later claiming a snag wasn't noted.
Crack measurement
BRE Digest 251 bands built in: fine (<1mm), moderate (1–3mm), wide (3–5mm), severe (>5mm). Crack pattern classification (vertical, stepped, radiating). Movement baseline you can defend.
NHBC chapter mapping
Tag every snag with the relevant NHBC chapter (Ch.3, 5, 6, 7, 9) and Approved Document (K, B, F, J, L, M, P). Auto-generated standards appendix at the back of the PDF.
Fire safety depth
Fire door ratings (FD30/FD30S/FD60/FD60S), smoke alarm grades (D1/D2/LD1/LD2/LD3), CO detector status with location. Compliance you can show, not assert.
12-month de-snag mode
Dedicated workflow for the end-of-2-year-warranty inspection. Different scope, different stakes — surfaced explicitly so it's never confused with a first-occupancy snag.
Most snagging tools stop at the photo
Snagging report FAQs
Quick answers for surveyors, buyers, and developers.
What is a snagging report?
When should a snagging inspection be commissioned?
What is a 12-month de-snag inspection?
Does the SurveyorSuite snagging report cite NHBC standards?
Can I send the snagging report to the developer?
What output formats are produced?
How does AI help with snagging reports?
One subscription. 15 report types.
£35/month or £30/month annually. All templates, unlimited reports, web + iOS + Android.
14-day free trial · No credit card to start · Launching soon