RICS Level 3 Building Survey reports for older, larger or non-standard properties
The deepest RICS residential survey. Comprehensive narrative, probable-cause analysis per defect, dedicated Energy Matters section, R-flag for documents the buyer should request. AI drafts from your notes — never invents materials, measurements or causes.
14-day free trial · All 15 templates included · £35/month
What's in the report
Sections A–M of the RICS Home Survey Standard 2023, plus auto-rendered house diagram.
- AAbout the inspectionSurveyor, RICS number, client, date, weather, related party disclosure, UPRN, property reference.
- BOverall opinionOverall narrative, documents received and to request, repairs cost guidance, further investigations.
- CAbout the propertyConstruction, year built/extended, accommodation, means of escape, EPC rating, energy efficiency issues, mains services, listed-building flag.
- DOutside the property9 elements: chimneys, roof, gutters, walls, windows, doors, conservatory, joinery, other. CR1/2/3/NI per element with description, defects, probable cause, recommendations.
- EInside the property9 elements: roof structure, ceilings, walls, floors, fireplaces, fittings, woodwork, bathrooms, other.
- FServices7 elements with safety warnings: electricity (RCD/EICR), gas/oil (Gas Safe), water, heating, water heating, drainage, common services.
- GGrounds8 elements: garage, outbuildings, trees, boundaries, retaining walls, driveways, other features, common areas.
- HIssues for legal advisersRegulation, guarantees, boundary issues, rights of way, statutory/planning matters.
- IRisksBuilding risks, ground risks, people risks (subsidence, flooding, structural movement, asbestos, radon, fire safety, trip hazards).
- JEnergy mattersJ1 Insulation, J2 Heating, J3 Lighting, J4 Ventilation, J5 General — dedicated to L3 only.
- KSurveyor's declarationSigned declaration, qualifications, RICS-aligned AI disclosure (text/photo/research/confirmation).
- LFurther investigations & quotesSpecialist investigations recommended, advice on obtaining quotations.
- MService description & termsStandard L3 service terms boilerplate.
What makes Level 3 different
Three things L3 has that L1 and L2 don't.
Energy Matters
Dedicated 5-part energy analysis: J1 Insulation, J2 Heating, J3 Lighting, J4 Ventilation, J5 General. Surfaces what the EPC misses — fabric performance, ventilation strategy, retrofit suitability.
Probable cause field
L3 splits each defect into description, defects, probable cause, and recommendations. The cause analysis is what buyers (and their solicitors) need to make repair decisions. L1 and L2 stop at "what's wrong" — L3 asks "why".
R-flag (Documents to Request)
Per-element flag with structured document list. EICR, FENSA, HETAS, boiler commissioning, building regs sign-off, gas safety. Independent of the CR1/2/3 rating — a CR1 element can still need an R-flag if paperwork is missing.
Level 3 FAQs
When is a Level 3 building survey appropriate?
How is Level 3 different from Level 2?
Does the Level 3 template support CR1/CR2/CR3 condition ratings?
Can I include valuations in a Level 3 report?
How does AI help with Level 3 reports?
One subscription. 15 report types.
£35/month or £30/month annually. All templates, unlimited reports, web + iOS + Android.
14-day free trial · No credit card to start
Last reviewed: · Updated as RICS guidance changes.