RICS Level 1 Condition Reports — the fastest path to a compliant report
Entry-level RICS Home Survey for properties in apparently good condition. Combined narrative per element, traffic-light ratings, R-flag for documents to request, AI assist on your notes.
14-day free trial · All 15 templates included · £35/month
What's in the report
Sections A–L of the RICS Home Survey Standard 2023.
- AAbout the inspectionSurveyor, RICS number, client, address, date, weather, property status, related-party disclosure.
- BSummary of condition ratingsAuto-generated rating table (CR3/CR2/CR1/NI grouped) + overall opinion + key concerns.
- CAbout the propertyProperty type, year built, accommodation, energy rating, mains services, grounds.
- DOutside the property9 external elements: chimneys, roof coverings, gutters, walls, windows, doors, conservatory, joinery, other. Combined narrative per element.
- EInside the property9 internal elements: roof structure, ceilings, walls, floors, fireplaces, fittings, woodwork, bathrooms, other.
- FServices7 services with safety warnings: electricity (RCD/EICR test), gas/oil (Gas Safe), water, heating, water heating, drainage, common services.
- GGrounds3 elements: garage, outbuildings, other.
- HIssues for legal advisersRegulations, guarantees, boundary issues, rights of way.
- IRisksRisks to building, grounds, people, other hazards.
- JSurveyor's declarationRICS-aligned AI disclosure block, signed declaration, qualifications.
- KFurther investigations & quotesSpecialist investigations, advice on obtaining quotations.
- LService description & termsStandard L1 service terms boilerplate.
Why pick Level 1
When the property is modern, in apparent good condition, and the buyer wants speed.
Single combined narrative per element
L1 uses one combined field per element (rather than splitting into description / defects / recommendations like L2/L3). Faster to write, faster to review — reflects the entry-level scope.
Bulk-rate from your notes
Type "CR1 throughout except <list>" and the AI applies CR1 to every in-scope element not in your list. The Summary section auto-populates the condition rating table.
R-flag (Documents to Request)
Independent per-element flag for paperwork: EICR, FENSA, HETAS, boiler commissioning, building regs. Distinct from the CR rating — a CR1 element can still need an R-flag.
Level 1 FAQs
When is a Level 1 Condition Report appropriate?
How is Level 1 different from Level 2?
Can I switch a survey from L1 to L2 mid-write-up?
Does Level 1 include a valuation?
How does AI help with Level 1 reports?
One subscription. 15 report types.
£35/month or £30/month annually. All templates, unlimited reports.
14-day free trial · No credit card to start
Last reviewed: · Updated as RICS guidance changes.